US Space Force Seeks New Heavy-Lift Launch Site by 2030 to Meet Surging Demand
US Space Force leaders state the military needs a third heavy-lift launch site up and running by 2030 to relieve pressure on existing facilities. Pentagon officials have not yet determined where the spaceport should go or how to acquire the land.

US Space Force leaders state the military needs a third heavy-lift launch site up and running by 2030 to relieve pressure on existing facilities. Pentagon officials have not yet determined where the spaceport should go or how to acquire the land. Air Force Secretary Troy Meink first mentioned the search in May following a congressionally mandated study.
Lt. Gen. Philip Garrant, head of Space Systems Command, called the 2030 goal an aspirational timeline given the complexities of building a launch site. Established spaceports in Florida and California hosted 175 orbital launch attempts last year. Officials project that demand will surge to 700 launches per year by 2036, making geographic resiliency essential to protect against natural disasters or military attacks.
The Space Force is considering multiple options for the new installation, including public-private partnerships, state land, and leasing commercial property. Garrant stated that no final decision or decision timeline has been established yet.
The story so far
Earlier coverage connected by shared names and topics. Follow the dates to see how coverage developed; these links do not imply every article describes the same event.
SpaceX to launch classified USSF-481 national security payload for the U.S. Space Force from CaliforniaSpaceX is scheduled to launch a classified national security payload for the U.S. Space Force from California this evening. The Falcon 9…
Connected by: US Space ForceEARLIER COVERAGE
Uzbekistan Becomes the 37th Signatory to the International Artemis Accords for Civil Space ExplorationThe Republic of Uzbekistan has officially joined the international coalition governing civil space exploration. During a ceremony in Samarkand on Monday, the…
Connected by: SecretaryEARLIER COVERAGE
Europe's Space Rider vehicle comes crashing down during drop testThe European Space Agency lost a full-scale prototype of its Space Rider spacecraft during a planned drop test on October 6 in…
Connected by: OfficialsEARLIER COVERAGE
Voyager Technologies Completes Environmental Testing on Griffin-1 Lunar Lander Ahead of LaunchVoyager Technologies' robotic Griffin-1 lunar lander has successfully completed a rigorous series of environmental evaluations at NASA's Jet Propulsion Laboratory. The spacecraft…
Connected by: CaliforniaEARLIER COVERAGE- NOWUS Space Force Seeks New Heavy-Lift Launch Site by 2030 to Meet Surging DemandCURRENT UPDATE
Original publication: 24 October 2026 01:03







