NASA Prepares Astronauts for the Moon Using Earthbound Simulators
Long before astronauts pilot commercial human landing systems to the lunar surface, they must master the descent right here on Earth.

Long before astronauts pilot commercial human landing systems to the lunar surface, they must master the descent right here on Earth. NASA is opening its doors to tour a new lunar landing simulation at the Ames Research Center in California, offering a rare look at how flight crews train for future missions.
Built by the Johnson Space Center and integrated into an upgraded simulator flight deck, the setup combines in-house and partner motion-based simulators. These tools let astronauts and engineering support teams practice the hazardous approach to the Moon, targeting a lunar landing by the year 2028 under the Artemis program.
Our read is that relying on ground-based motion systems highlights a heavy operational shift, where NASA increasingly leans on integrated partner technology to de-risk commercial spacecraft before crews ever leave Earth orbit. That careful preparation aims to establish an enduring human presence near the lunar South Pole and lay the groundwork for eventual crewed missions to Mars.
Visitors on upcoming media tours will have the chance to experience a Vertical Motion Simulator ride-along and interview subject matter experts.
As space agencies race to build out a new era of exploration, watching how these earthbound dry runs translate to actual flight behavior will remain the ultimate test to follow.
The story so far
Earlier coverage connected by shared names and topics. Follow the dates to see how coverage developed; these links do not imply every article describes the same event.
NASA Invites Media to the 2026 von Braun Space Exploration Symposium at the University of AlabamaNASA has invited journalists to cover the upcoming 2026 von Braun Space Exploration Symposium. The event will take place from Monday, October…
Connected by: NASA Invites MediaEARLIER COVERAGE
NASA Delays Artemis III to 2027 for Orbit Tests of Blue Origin and SpaceX LandersNASA plans to launch the 14-day Artemis III mission in 2027 to test human landing systems in low Earth orbit before attempting…
Connected by: ArtemisEARLIER COVERAGE
NASA, Partners Accelerate Lander Development for 2028 Moon MissionsNASA and commercial partners Blue Origin and SpaceX have streamlined their lander designs and operations to accelerate crewed lunar missions toward a…
Connected by: EarthEARLIER COVERAGE
NASA Outlines Complex Flight Plan and Testing Procedures for the Artemis III Moon-Lander MissionNASA outlined its concept of operations for the Artemis III moon-lander test flight during a press conference at Kennedy Space Center. The…
Connected by: AstronautsEARLIER COVERAGE- NOWNASA Prepares Astronauts for the Moon Using Earthbound SimulatorsCURRENT UPDATE
Original publication: 26 October 2026 22:43







